Victoria Bridge
Layher Allround modular scaffolding worked perfectly for this project. Due to limited space on the construction site and being next to a major highway the scaffold had to be cantilevered to reduce the footprint on the ground.
Minimal footprint
Space was at a premium for Heb Construction, so they required a system that could deliver a minimal footprint, be highly adaptable and above all provide a high level of safety for site staff.
Highly efficient
The Layher Allround system exceeded Heb Construction’s expectations and they were also impressed with Master Scaffolding’s highly efficient and effective service.
Thanks to Shaun Mason of Master Scaffolding for the use of these photos.
-
Contact
Shaun Mason
Company
Location
Website
-
Components
Details
Cantilevered scaffold to reduce ground footprint
Comments
Layher Allround system exceeded Heb Construction’s expectations
Shaun Mason
MORE SCAFFOLDING PROJECTS
Wairau Bridge Cycleway
Scaffold Marlborough were asked to scaffold Wairau River Bridge SH1 in Blenheim. Rob Helstrom of Scaffold Marlborough said Continue reading
Omāroro Water Reservoir
Omāroro Water Reservoir is a bulk water storage facility and key infrastructure project for the Wellington region. WorkZone Scaffolds, along with their partners, Continue reading