Excavated Shaft Stair
Above Scaffolding were appointed to design and install a 94m stairway access tower into an excavated Continue reading
Above Scaffolding were appointed to design and install a 94m stairway access tower into an excavated Continue reading
Layher Allround public access bridges for the Pedalprix event in Adelaide’s Victoria park by Caledonia Scaffolding… Continue reading
Active Platforms hanging scaffold installation, erected for Sydney Trains over Salt Pan Creek shows the versatility… Continue reading
With a seating capacity in excess of 3,000, Clifton Productions provided what has been called the best temporary seating Continue reading
Clifton Productions built a six storey high, flame throwing Dragon which was constructed from Layher Allround Scaffolding Continue reading
A facility for carrying out the blasting and painting of ship modules was required for a major project being undertaken by ASC in Adelaide. Continue reading
Statewide Staging Systems was showing off its new Layher event deck staging, stand, steps and lighting towers at the Perth Continue reading
CGE Hire was engaged by one of the country’s largest infrastructure projects for the design and supply of this suspended Continue reading
Port Bonython Jetty, which is owned by the state government, is a 2.4km long jetty making it the largest in South Australia Continue reading