220kV Substation Scaffold
Three sealing-end structures for Auckland’s new 220kV circuits at the point where they return above ground by Cam… Continue reading
Three sealing-end structures for Auckland’s new 220kV circuits at the point where they return above ground by Cam… Continue reading
Shopping mall temporary roof in Auckland by Camelspace. Over 15,000m² of temporary Keder Roof… Continue reading
Mobile Keder roof at Auckland Waterview Connection Project by North Shore Scaffolding. Layher Keder Roof… Continue reading
Pedestrian ramp and 16m span bridge over Auckland railway tracks by Camelspace. Layher Allround scaffolding… Continue reading
Over water mobile scaffold in Auckland by South Pacific Scaffolding. A scaffold 19m wide by 5m long, was shifted six times… Continue reading
Over 2,000 extra seats installed at Eden Park Auckland for All Blacks Rugby match by Camelspace. Seating… Continue reading
Cinema scaffold in Auckland by Upright Access Systems. We used 27m long Layher Aluminium 450 trusses supported by… Continue reading
Encapsulating cantilevered scaffold in Auckland for Canam Construction by North Shore Scaffolding. Layher’s design support… Continue reading
Site restrictions on the Argent Hall in Auckland’s CBD were very difficult with only two elevations allowing Continue reading