![SH1 Under Bridge Scaffold by Instant Scaffolding](https://www.layher.co.nz/wp-content/uploads/sh1-under-bridge-scaffold-16x9.jpg)
SH1 Under Bridge Scaffold
Instant Access provided this tiered under bridge access system for the surface preparation and coating of two adjacent bridges that cross the State Highway 1 motorway leading into Wellington, New Zealand.
SpeedyScaf frames
Brad Leggett, Wellington Branch Manager for Instant Access NZ Ltd, said that they decked out with 3.07m² Allround bays, spanning the 14.5m underside of the bridges with Layher 750mm aluminium lattice girders. The whole set up was supported from the top by counterweighted rigs constructed out of SpeedyScaf frames.
Thank you to Brad Leggett of Instant Access NZ Ltd for the use of these photos.
-
Contact
Brad Leggett
Company
Location
Website
-
Components
Layher SpeedyScaf System
Layher Allround Scaffolding
Layher Aluminium Beams
![Scaffold under bridge over highway](https://www.layher.co.nz/wp-content/uploads/scaffolding-under-bridge-over-highway-1024x768.jpg)
![Layher SpeedyScaf System on bridge with Allround and Aluminium beams beneath](https://www.layher.co.nz/wp-content/uploads/under-bridge-scaffolding-1024x768.jpg)
![Instant Access constructed scaffolding on Wellington highway bridge](https://www.layher.co.nz/wp-content/uploads/wellington-highway-bridge-scaffold-1024x768.jpg)
![Close up of Instant Access maintenance scaffolding under bridge](https://www.layher.co.nz/wp-content/uploads/scaffolding-beams-under-bridge-1024x768.jpg)
MORE SCAFFOLDING PROJECTS
![quay street speedyscaf](https://www.layher.co.nz/wp-content/uploads/quay-street-speedyscaf-535x301.jpg)
Quay Street SpeedyScaf
Upright Access Systems were contracted to provide access for a repainting job on Auckland’s Quay Street. For this large repainting job, Upright Access Systems used Layher’s efficient SpeedyScaf scaffolding system. Continue reading
![](https://www.layher.co.nz/wp-content/uploads/speedyscaf-art-deco-capital-16x9-535x301.jpg)
SpeedyScaf in Art Deco Capital
Bay Scaffolding were contracted to provide access to an Art Deco building in Napier. The Criterion Art Deco Backpackers building Continue reading