Plant Room Propping
“We were asked to provide propping support for the form work of a concrete lid on this plant room,” said Greg Lennon of Action Scaffolds. The slab thickness was 500mm (12.5kN/m² or 1.25 tonnes/m²).”
Excellent technical support
“Within the confines of a 4m diameter, Allround’s variety of bay sizes and load capacity enabled us to give the crew at Tweed Shire Council a superior coverage of the formed area and a work platform for their team to safely and easily install their formwork. As always the technical support of Julian Schrauth was excellent.”
Thanks to Greg Lennon of Action Scaffolds for the use of these photos.
-
Contact
Greg Lennon
Company
Action Scaffolds
Location
Website
-
Components
Layher Allround Scaffolding
Layher U-head JacksDetails
Concrete slab thickness was 500mm
Comments
Allround gave the team a work platform to safely and easily install their formwork
Greg Lennon, Action Scaffolds
MORE SCAFFOLDING PROJECTS
Puhinui Interchange Propping
TPL Access were engaged to provide propping at Puhinui Station in Auckland. Puhinui Station is being upgraded Continue reading
The International – Heritage Building
Formerly Fonterra’s base in Auckland, The International is now a high-end apartment block thanks to the Continue reading