Grand Design Scaffold
Safe Scaffolding undertook this technically challenging scaffold project featured on the NZ Grand Designs TV series.
Cantilevered off
Access was needed for construction of a new residential home which was being cantilevered off the side of a very step section in Northland, Wellington. Safe Scaffolding used a combination of the Layher Allround modular scaffolding system and stairs to provide access for the numerous contractors. The project was carried out in multiple stages using around 100 man hours to complete.
Extreme slope
“It was a very difficult building project complicated by the extreme slope. The Layher Allround system provided the flexibility we needed to make alterations for large window installations and curved cladding. The building contractors were very happy with Safe Scaffolding’s service and responsiveness” said Renee Lincoln of Safe Scaffolding.
Thanks to Renee Lincoln of Safe Scaffolding for the use of these photos.
-
Contact
Renee Lincoln
Company
Location
Website
-
Components
Details
100 man hours, very steep section!
Comments
Extreme slope, Layher Allround system provided the flexibility we needed
Renee Lincoln
MORE SCAFFOLDING PROJECTS
Approved Ponsonby Villa Repaint
Approved Scaffolding were requested to build a scaffold for a repaint on a Ponsonby Villa. The site was tight for Continue reading
Aston Towers Apartments
Aston Towers stands on the corner of Abel Smith Street overlooking Wellington’s CBD. This 1960’s built apartment block required re-painting Continue reading