Fonterra Waitoa Scaffold
DIALOG Fitzroy were contracted to build a large scale façade scaffold to refurbish external walls and a large window for one of Fonterra’s milk powder facilities. The façade scaffolding was constructed using Layher’s Allround modular scaffolding system, as well as two GEDA 500 ZZP hoists for transporting gear up and down the scaffold.
Efficient scaffold design
Mark Dunn of DIALOG Fitzroy explains, “the client presented a very tight deadline of three months for this job, so an efficient design was key to delivering the build on time. The Layher engineering team provided extensive support which assisted in this complicated build. The client was very happy with the time frame and safe manner the scaffold was constructed in.”
Thanks to DIALOG Fitzroy for the use of these photos.
-
Contact
Mark Dunn
Company
Location
Website
-
Components
Layher Allround Scaffolding
GEDA 500 ZZP hoistComments
The client was very happy with the time frame and safe manner the scaffold was constructed in
Mark Dunn, DIALOG Fitzroy
MORE SCAFFOLDING PROJECTS
Merck Sharp and Dohme weather protection
DIALOG Fitzroy were contracted to provide full access and weather protection for an industrial building located in Continue reading
Hydro demolition scaffold
TPL Access were contracted by Freyssinet NZ to provide safe access to 33m tall cement silos. Silo’s 3 – 6, located at the Golden Bay Cement plant in Continue reading