Demolition Protection Panel System
Demolition projects often present a range of challenges, including dust and noise suppression. This is made more difficult when working in close proximity to other buildings, pedestrians, and vehicular traffic in the heart of a capital city.
McMahon Services have built a reputation as leaders in demolition, and have recently begun investing in Layher Allround products. This project in the Adelaide CBD combined the Layher Allround scaffolding system with Protect System panels and the FW System. This achieved an impressive solution that is both functional and presents a professional appearance.
Spanning 12.5m, the remarkably strong Layher FW system beam was designed to withstand loads from the fully encapsulated structure above. The Protect System’s panels provide an enclosed work-space for demolition operations whilst minimising disturbance to others.
Thank you to McMahon Services for permission to use these photographs.
-
Contact
McMahon Services
Location
Components
Layher Allround Scaffolding
Layher Allround FW System
Layher Protect System
MORE SCAFFOLDING PROJECTS
Merck Sharp and Dohme weather protection
DIALOG Fitzroy were contracted to provide full access and weather protection for an industrial building located in Continue reading
Hydro demolition scaffold
TPL Access were contracted by Freyssinet NZ to provide safe access to 33m tall cement silos. Silo’s 3 – 6, located at the Golden Bay Cement plant in Continue reading