Boiler 6 Fonterra Clandeboye
Fonterra required maintenance to be carried out on Boiler 6 at their Clandeboye site. Geeves Scaffolding chose Layher Continue reading
Fonterra required maintenance to be carried out on Boiler 6 at their Clandeboye site. Geeves Scaffolding chose Layher Continue reading
Deteriorating weather conditions were overcome by the speed and ease of the Layher stair access into and out of the pit… Continue reading
DIALOG Fitzroy were engaged by Worley Parsons as the scaffolding contractor for refurbishment of an un… Continue reading
DIALOG Fitzroy use Layher Allround Lightweight scaffolding on two large distillation columns due to its Continue reading
High wind loads and extreme winter weather provided a challenging environment for the 200+ tonnes of scaffold in use… Continue reading
A scaffold provided safe access for installation of high voltage overhead lines and an enclosed capsule for installation of… Continue reading
Asbestos removal roofing and scaffold in Christchurch for Winstone factory by Elliott Scaffolding. Continue reading
Telecom demolition project in Christchurch for Fletcher Construction by Elliott Scaffolding. Layher Allround Scaffolding… Continue reading
Keder XL roof scaffolding at Christchurch Airport for Leighs Construction by Geeves Scaffolding. Layher scaffolding… Continue reading