Car Park Propping
This Wellington car park sustained damage as a result of the 6.5 earthquake on 21 July 2013. Spalling and cracking to beams supporting the car parks ramps presented real concern considering the risk of aftershocks and the need to remove cars remaining in the building.
15 tonne of Layher Allround
WorkZone Scaffolds, with the support of a local consulting engineer and Layher’s senior design engineer Kenneth Redman, started on site within 5 days of the quake and impressively started removing cars from the lower two levels within 9 days of the quake. In total WorkZone installed more than 15tonne of Layher Allround propping on this project.
Responsive and professional
Graham Burke of WorkZone commented the client was grateful for the responsiveness and professionalism of all parties involved. The client was certainly glad that the propping solution was installed before the second earthquake, (16th of August 2013, measuring 6.6).
Thanks to Graham Burke of Workzone Scaffolds for the use of these photos.
-
Contact
Graham Burke
Company
Location
Website
-
Components
Details
15 tonne of Layher Allround
Comments
The client was grateful for the responsiveness and professionalism
Graham Burke
MORE SCAFFOLDING PROJECTS
Brandon Street Double
Camelspace faced many challenges during this technically complex scaffolding project on Wellington’s Brandon Street. The Continue reading
Whangarei Earthquake Strengthening Roof
Northland Scaffolding were asked to provide exterior scaffolding and a temporary roof structure spanning 26m wide × 45m long Continue reading