-
Advance Guardrail System
-
- An essential safety tool
- Lightweight and easy to handle
- Compatible with non-Layher scaffolding
- Simple
-
-
Fall prevention
Layher’s Advance Guardrail System is a really effective way of preventing scaffolders falling during erection and dismantling of scaffolds. The Advance Guardrail System is lightweight (made of aluminium) and easy to handle. An essential tool for any scaffolding crew especially those building and dismantling low level scaffolds where the available anchor points are insufficient for a deployed fall arrest system (pendulum effect). It also offers scaffolders who are working at height an added level of security.
Easy to use and makes erecting scaffold quicker – from my point of view it’s a no brainer as our bays are 2.5 and 3m long and the lanyards are 2m long, so it gives the scaffolders a better and safer way to get to the next bay.
Mick Curran, Managing Director
-
Compatible with non-Layher scaffolding
The Advance Guardrail System attaches to scaffolding with 48.3mm tube. The safety system provides a prefixed guardrail at working height before the scaffolder enters the working platform to install scaffold guardrails and toeboards.
The Advance Guardrail System post was reinforced to also fulfil the requirements of Australia New Zealand Standard. AS/NZS 4994.1:2009 Temporary Edge Protection – General Requirements. Which also makes it a persuasive tool for installation of other non-scaffolding roof edge protection systems.
-
Simple
Three components made of aluminium, for easy handling, make up Layher’s Advance Guardrail System:
- Advance Guardrail post reinforced (designed for one or two telescopic ledgers)
- Advance Guardrail telescopic ledger
- Advance Guardrail for end face of scaffolding
Contact us now to start your partnership with Layher.
LIGHTER. FASTER. STRONGER. LAYHER.