-
Rack and pinion lifts
GEDA’s range of goods and personnel hoists are ideal for construction applications that require safe, cost effective and fast lifting.
Designed to transport building materials and/or workers, the hoists are simple to operate, robust, and offer a comprehensive set of safety features. Made in Germany.
-
-
-
Layher 200 Hoist
Layher’s 200 Hoist is a robust vertical materials hoist. Specifically designed to accommodate Layher’s full range of scaffolding components, the 200 Hoist is powerful and lightweight, and offers a fast, convenient and cost-effective lifting solution.
-
-
GEDA 300 Z
The GEDA 300 Z materials hoist with its lightweight 2m aluminium mast sections has been used on building sites for many years. Its convenient and compact design makes it the ideal solution for moving small to medium size building materials.
-
-
-
GEDA 500 Z/ZP
The GEDA 500 Z/ZP offers a simple and cost effective hoist solution for materials and people.
With a maximum load of up to 5 people (500kg), or 850kg for materials, it offers flexibility, saves time and guarantees optimal logistics in construction.
500 Z/ZP
-
-
-
GEDA 500 Z/ZP ‘Super Long’
The GEDA 500 Z/ZP ‘Super Long’ offers all the benefits of the 500 Z/ZP but with a 3.2m long platform.
The super long platform makes the GEDA 500 Z/ZP SL the ideal hoist for transporting long material like gib board.
500 Z/ZP ‘Super Long’
-
-
-
GEDA 1200 Z/ZP
Its maximum load bearing capacity of 1500kg or up to 7 people makes this single mast platform the ideal hoist for heavy loads and efficient work methods.
-
-
-
GEDA 1500 Z/ZP
The transport platform GEDA 1500 Z/ZP unites two different machines in one: a hoist for materials with a load bearing capacity of 2000kg and a transport platform for material and people.
-
-
-
GEDA 2500 Z/ZP
Using a single mast, the GEDA 2500Z/ZP hoist can be used as a transport platform for materials only, or materials & personnel with a maximum load capacity of 2500kg.
-
-
-
GEDA BL 2000
The GEDA BL 2000 is ideal for large construction sites. Engineered to accommodate materials up to 2000kg, or 23 people, with a lifting height of 250 m and a speed of 55 metres per second.
-
-
GEDA Rack and pinion hoists comparison table
Comparison table Layher 200 Hoist GEDA 300 Z GEDA 500 Z/ZP GEDA 500 Z/ZP ‘Super Long’ GEDA 1200 Z/ZP GEDA 1500 Z/ZP GEDA 2500 Z/ZP GEDA BL 2000 Cargo Material Material People / material People / material People / material People / material People / material People / material Capacity (up to) 200kg 300kg 850kg / 5 persons 850kg / 5 persons 1500kg / 7 persons 2000kg / 7 persons 2500kg / 7 persons 2000kg / 23 persons Lifting height 35m 100m 100m 100m 150m 100m 200m 250m Lifting speed 25 m/min 30 m/min 12 m/min
or 24 m/min12 m/min
or 24 m/min12 m/min
or 24 m/min12 m/min
or 24 m/min12 m/min
or 40 m/min55 m/min Platform type – – C SL C-1500kg with double “C” door GD With double “C” door Single Platform internal dimensions L × W 1.20m × 0.75m 1.40m × 0.75m 1.40m × 1.60m 3.20m × 1.00m 3.20m × 1.40m 4.35m × 1.65m 3.55m × 1.45m 3.20m × 1.45m Power supply 1.7kW / 230 V / 50 Hz / 16 A 2.5kW / 400 V / 50 Hz / 16 A 3kW / 6.1kW / 400 V / 50 Hz / 16 A 3kW / 6.1kW / 400 V / 50 Hz / 16 A 2 x 3kW / 6.1kW / 400 V / 50 Hz / 32 A 2 x 3kW / 6.1kW / 400 V / 50 Hz / 32 A 25kW / 380-480 V / 50 Hz / 32 A – 63 A 32kW / 380-400 V / 50 Hz / 32 A – 63 A -
-
Contact us now to start your partnership with Layher.
Projects using GEDA Hoists, Lifts and Chutes
Wellington District Court
Wellington District Court Upgrade T he Wellington District Court has undergone a $20 million upgrade to create a more modern, safe environment and improve access to justice services. As part of this project, Geeves Scaffolding (Wellington) was awarded the contract to provide safe access for tradespeople and weather protection throughout the four-stage, 14-month construction process. […] Continue reading
Hydro demolition scaffold
TPL Access were contracted by Freyssinet NZ to provide safe access to 33m tall cement silos. Silo’s 3 - 6, located at the Golden Bay Cement plant in Continue reading
Surgical facilities expansion
Scafit were engaged to provide an access and weather protection solution at Palmerston North Hospital for the expansion of their surgical facilities. Continue reading