Fitzroy Industrial Chimney

Fitzroy Industrial Chimney by DIALOG Fitzroy
Fitzroy Industrial Chimney by DIALOG Fitzroy

Fitzroy Industrial Chimney

DIALOG Fitzroy was contracted to scaffold two large distillation columns standing 55m and 37m respectively.

Fitting accuracy

80 tonne of equipment was used on this project. The Layher Allround Lightweight modular scaffold technology was the system chosen due to its fitting accuracy and speed of erection to gain access. The challenge was scaffolding the columns whilst the plant was live. The design needed to be free standing and to withstand significant wind loads.

Platform stairs

“The Layher Allround System gave us very clean lines for installation of containment sheeting, and provided an ideal safe working platform for this type of project” said Bruce Sinton, DIALOG Fitzroy project lead. “The Layher aluminium platform stairs were also an excellent addition for allowing the maintenance team to safely move up and down the columns” he said.

Thanks to Bruce Sinton, Project Lead, DIALOG Fitzroy for the use of these photos.


DIALOG Fitzroy use Layher Allround Lightweight scaffolding on two large distillation columns standing 55m and 37m respectively.
DIALOG Fitzroy use Layher Allround Lightweight scaffolding on two large distillation columns standing 55m and 37m respectively.

MORE SCAFFOLDING PROJECTS