Euro Scaffolds Bridge

Euro Scaffolds were engaged by Downers to build a suspended scaffold below a rail bridge in Taumarunui.
Euro Scaffolds were engaged by Downers to build a suspended scaffold below a rail bridge in Taumarunui.

Euro Scaffolds Bridge

Euro Scaffolds were engaged by Downers to build a suspended scaffold below a rail bridge in Taumarunui. The scaffold provided safe access for strengthening work on the central pier. Euro Scaffolds used Layher Allround modular scaffolding and extensive design and engineering work was done with help from Layher’s engineers.

Hung off pier

The scaffold could not be suspended from the bridge and had to be hung off the pier itself. 1 in 15 year flood conditions were also considered in the design, and a ensuing flood put this engineering to the test! Despite tree size debris in the river the scaffold held together.

Three additional bridges

Jono Laity said the client was very impressed and work on three additional bridges was gained on the back of this successful project.

Thanks to Euro Scaffolds for the use of these photos.


Worse than expected flooding were no problem for Layher Scaffolding
Worse than expected flooding were no problem for Layher Scaffolding