-
-
Temporary Stair Solutions
-
- Comprehensive range
- Aluminium platform stairs
- Construction site and public access stairways
- Craneable stairs
- Modular stairs
-
-
Comprehensive range
Layher’s stair solutions offer temporary access for a variety of applications. From public access stairways to construction site platform stairs, Layher has the right solution for your access requirements, no matter which scaffolding system you use.
Each component seamlessly integrates with the Allround and SpeedyScaf Scaffolding Systems, making it the ideal choice to extend the access capabilities of your existing scaffolding solution.
Layher’s stair solutions can also be built as independent towers, providing cost effective options on projects which do not require a scaffold work platform.
-
The New Zealand market is definitely demanding stairs more on site, even in residential. This is mainly for quicker access, and obviously the safety benefits.
Layher’s stair range is awesome, it means we have a solution for any job: platform stairs, heavy duty stairs, craneable stairs or modular stairs. With Layher we have it covered.
Kurt Simpson, NZ Scaffolding Group
-
Aluminium platform stairs
Layher’s Aluminium Platform Stairs are stable and lightweight, yet very strong. They are fast to assemble and disassemble, and are fully compliant with all New Zealand safety requirements. A cost effective and safer alternative to ladders, these stairs improve efficiency on site and are ideally suited for small to medium sized construction projects. Available in heights of 1m, 1.5m and 2m.
-
-
Construction site and public access stairways
The versatility and robustness of Layher’s Allround stairway towers 200, 500 and 750 makes them an extremely capable solution for quick, safe and convenient access for even the most challenging construction site and public access requirements.
-
Stairway Tower 200
for light foot traffic10 step, 2m high
2kNm², riser 200mm -
Stairway Tower 500
for construction site access9 step, 2m high
5 step, 1m high
5kNm², riser 200mm -
Stairway Tower 750
for public access8 step, 1.5m high
5 step, 1m high
2 step, 0.5m high
7.5kNm², riser 166mm - Notes:
1. Childproof guardrails are available for Allround Stairway Towers 500 and 750 only.
2. Layher’s Allround Stairway 750 complies with New Zealand Building Code e.g. permanent stairs
3. For special requirements Layher also offers System Handrail for Stairs and non-slip covers for steps and landings. -
-
The Layher aluminium platform stairs were an excellent addition for allowing the maintenance team to safely move up and down the scaffold.
Bruce Sinton, Fitzroy Engineering Group Limited
-
Craneable stairs
Specially designed Allround standards (2.21m) also enable you to create complete stairway modules on the ground and position them, level by level, using a crane or hoist.
Hinged pins and spindle pins create a strong connection between each module. Once complete, the tower may be easily repositioned without being disassembled.
Stair towers may be assembled in unidirectional and bidirectional configurations. The stair landing maybe exited on the right side, the left side or straight ahead, depending on your application and the orientation of the tower.
-
-
-
-
Modular stairs
To complete the range Layher also offers the extremely versatile and durable Modular Stairway system.
Made of hot-dip galvanised steel the stair is constructed using one head step (top), one foot step (bottom), and as many intermediate steps as needed to reach the desired height.
-
MORE REASONS TO CHOOSE LAYHER
-
ALLROUND SCAFFOLDING
-
SPEEDYSCAF
-
HOISTS AND LIFTS
Projects using the Layher Stair Solutions
Developers viewing platform
Sidewall Scaffolding was contracted to build this 11-metre-high viewing platform in Parnell Auckland. Continue reading
Cape Campbell Lighthouse
Cape Campbell Lighthouse required maintenance work and Scaffold Marlborough were asked to provide access for contractors. Located about 50 kilometres from Blenheim, the 116 year old lighthouse marks Continue reading
Bomb Station Scaffold Tower
This "Bomb Station” was built for the Flava NZ Bomb Competition situated on the picturesque Lake Tikitapu (Blue Lake). Continue reading