Shutdown remediation scaffold
Remarkable efficiency was achieved by Ausscaff with their provision of access for shutdown remediation works on this project. Using laser scanning technology, Ausscaff produced a clever design incorporating their Layher Allround Scaffolding, together with Layher’s Allround FW Bridging System, to achieve impressive 20m spans.

Pre-built structures
Incorporating crane-handling in the methodology allowed pre-built structures to be lifted into position when required: machine outage time was reduced by 6 shifts. The long spans of the structure also meant only one subsequent adjustment for paint pick-ups – compared to the 10 adjustments required with a conventional scaffolding solution.
Making the impossible possible
Ausscaff’s Operations Manager, Russell Counsell, observed: “We thoroughly enjoy combining our experience, our expertise and our Layher Allround systems to demonstrate to our clients our ability to make the impossible possible!”
Thank you to Russel Counsell for permission to use these photographs.

-
Contact
Ausscaff
Location
Components
MORE SCAFFOLDING PROJECTS

Merck Sharp and Dohme weather protection
DIALOG Fitzroy were contracted to provide full access and weather protection for an industrial building located in Continue reading

Hydro demolition scaffold
TPL Access were contracted by Freyssinet NZ to provide safe access to 33m tall cement silos. Silo’s 3 – 6, located at the Golden Bay Cement plant in Continue reading