The right parts, at the right time, at the right place – always
80 m² footprint and a safe working platform at a height of almost 40 metres for refurbishing the ceiling and the hot face of a boiler in a paper mill – these were the basic facts. No problem for experienced scaffolders and Layher Allround Scaffolding. However, the fact that the only possibility for men and materials to find their way inside was through manholes with a diameter of just 50 centimetres required detailed planning in the run-up to the project.
-
-
-