This picture-perfect suspended scaffold erected by Brazier Scaffolding was required for maintenance works on a cycle trail bridge. Using Layher’s Allround modular scaffolding system and Layher’s Aluminium Beams, Brazier Scaffolding built this 38m long suspended scaffold.
Up an down within a month
Glen Brazier commented, “the entire scaffold was up and down within a month. The main challenge for us was that the bridge needed to remain available to cyclists throughout the project. Nothing that the boys couldn’t handle, just some innovation from a cartage point of view.”
Allow access for workers
A Layher aluminium platform stair tower (3.07m x 1.4m) was also installed by Brazier’s to allow access for workers from the ground to the suspended working platforms, thus keeping the top of the bridge unimpeded for cyclists.
Thanks to Glen Brazier of Brazier Scaffolding for the use of this photo.
-
Contact
Glen Brazier
Company
Location
Website
-
Components
Layher Allround Scaffolding
Layher Aluminium BeamsComments
the entire scaffold was up and down within a month. The main challenge for us was that the bridge needed to remain available to cyclists throughout the project
Glen Brazier, Brazier Scaffolding
MORE SCAFFOLDING PROJECTS

Wallingford Bridge
Wallingford Bridge Strengthening L ocated in Hawkes Bay, the Wallingford Bridge project required smart, efficient scaffolding solutions to support essential strengthening and guardrail installation. Rocket Scaffolding, working with Layher systems, provided the access needed for contractors to safely complete their work under complex conditions. Safe, Practical Solutions for a Time-Sensitive Upgrade Todd Price of Rocket […] Continue reading

Wairau Bridge Cycleway
Scaffold Marlborough were asked to scaffold Wairau River Bridge SH1 in Blenheim. Rob Helstrom of Scaffold Marlborough said Continue reading