High Bridge
This impressive historic railway bridge in the South Island was in desperate need of maintenance. Brazier Scaffolding were contracted to provide a suspended access scaffold for blast and paint works. The scaffold also needed to be encapsulated in order to contain the lead paint from the surrounding environment.
Long suspended scaffolding
Brazier Scaffolding erected this 50m long suspended scaffold using Layher’s Allround modular Scaffolding system. This was one of three sections which Brazier simultaneously erected on the same bridge.
Logistical challenge
Glen Brazier commented, “over 150 tonne of Layher Allround was required for this project. The real challenge for us was logistical. The point of the build wasn’t very accessible which required some thinking outside of the square. The team did a great job and the project ran according to plan.“
Thanks to Glen Brazier of Brazier Scaffolding for the use of this photo.
Layher Scaffolding Excellence Awards 2019
Congratulations to Glen Brazier and the team at Brazier Scaffolding, for High Bridge – winners of the Layher Scaffolding Excellence Awards 2019 – Industrial, Infrastructure and Event Category.
Learn more about Layher Scaffolding Excellence Awards
-
Contact
Glen Brazier
Company
Location
Website
-
Components
Layher Allround Lightweight Scaffolding
Comments
Over 150 tonne of Layher Allround was required for this project. The real challenge for us was logistical.
Glen Brazier, Brazier Scaffolding
MORE SCAFFOLDING PROJECTS
Wellington District Court
Wellington District Court Upgrade T he Wellington District Court has undergone a $20 million upgrade to create a more modern, safe environment and improve access to justice services. As part of this project, Geeves Scaffolding (Wellington) was awarded the contract to provide safe access for tradespeople and weather protection throughout the four-stage, 14-month construction process. […] Continue reading
Peninsula Roof Celebration
Peninsula Roof Celebration Peninsula Roofing and Scaffolding was selected to construct a stage for the Tuia 250 Captain Cook Ngati Hei – Mercury Bay Commemorations in Whitianga. Richard Vetter, Former Director at Peninsula Scaffolding, highlighted how Layher products played a key role in the project’s success: “We used a combination of Layher Allround Scaffolding, Layher […] Continue reading