Mövenpick Hotel
The Mövenpick Airport Hotel was built just outside Stuttgart near the airport and new trade fair grounds. The 8,720 square metre Layher SpeedyScaf structure was erected by a local scaffolding firm, Postweiler Gerüstbau GmbH. One of the unusual features of the Mövenpick Hotel is its floor plan, with quarter-circles at each end. Round scaffolding such as this can be assembled very economically using Layher SpeedyScaf Scaffolding.
Internal guard rails
Initially the scaffolding was erected 400 mm from the façade and inside guard rails were fitted. The installation of the external insulation reduced the distance of the scaffolding from the wall allowing the internal guard rails to be removed. Once the external covering was fitted the wall ties were also repositioned from the bare concrete to the façade system. The scaffold also serves as roof edge protection.
Thanks to Peter Prax of Layher Germany for these photos.
-
Company
Postweiler Gerüstbau GmbH
Location
Website
Postweiler Gerüstbau GmbH
-
Components
Layher SpeedyScaf Scaffolding System
Details
The scaffold also serves as roof edge protection
MORE SCAFFOLDING PROJECTS
Quay Street SpeedyScaf
Upright Access Systems were contracted to provide access for a repainting job on Auckland’s Quay Street. For this large repainting job, Upright Access Systems used Layher’s efficient SpeedyScaf scaffolding system. Continue reading
SpeedyScaf in Art Deco Capital
Bay Scaffolding were contracted to provide access to an Art Deco building in Napier. The Criterion Art Deco Backpackers building Continue reading