Scaffolding with More Possibilities. Lighter. Faster. Stronger. Layher.

Perth Metro Rail Project

Perth Metro Rail Project by Celtic Scaffolding
Perth Metro Rail Project by Celtic Scaffolding

Perth Metro Rail Project

Celtic Scaffolding built this birdcage for the Perth Metro Rail Project, Esplanade station. The birdcage enabled Leighton Kumagai Joint Venture to do work on the inside of the roof.

Keeping ahead of the contractors

Celtic Scaffolding needed to span across access voids to the lower platform, which was a tricky job, especially with concrete columns in the way. They erected 17 3.07 bays within the specified type time frame, keeping ahead of the contractors who were following behind. This was Celtic’s first job using Layher scaffolding.

Thanks to Damian Beausang of Celtic Scaffolding for the use of these photos.


  • Contact

    Damian Beausang

    Company

    Celtic Scaffolding

    Location

    International

    Website

    www.celticscaffolding.com.au

  • Components

    Layher Allround Scaffolding

    Details

    The birdcage enabled Leighton Kumagai Joint Venture to do work on the inside of the roof

    Comments

    They erected 17 3.07 bays within the specified type time frame, keeping ahead of the contractors who were following behind
    Damian Beausang, Celtic Scaffolding


MORE SCAFFOLDING PROJECTS