Scaffolding with More Possibilities. Lighter. Faster. Stronger. Layher.

Protect Paint Project

Protect Paint Project by ASC and TLT a
Protect Paint Project by ASC and TLT Access Services

Protect Paint Project

A facility for carrying out the blasting and painting of ship modules was required for a major project being undertaken by ASC in Adelaide. Layher’s Steel Cassette Roof, Protect panels and Allround Scaffolding were combined to create a large encapsulated work area in the fraction of the time required for a permanent structure.

600 wall cassettes

Each of the “building’s” measured 30m long x 30m wide and 13m to the eave and were linked by a 21m bridge that was also used to support the monorail for the sliding doors. The steel cassette roof was built in modules by TLT and craned into position and had three of the bays fitted with translucent panels to promote natural light. Over 600 wall cassettes were required in total to complete the project which took two months to build.

Thank you to Warrwick March for use of these photos.




Over 600 wall cassettes were required in total to complete the project
Over 600 wall cassettes were required in total to complete the project

The steel cassette roof was built in modules by and craned into position
The steel cassette roof was built in modules by and craned into position

MORE SCAFFOLDING PROJECTS


Peninsula Roof Celebration

Peninsula Roof Celebration Peninsula Roofing and Scaffolding was selected to construct a stage for the Tuia 250 Captain Cook Ngati Hei – Mercury Bay Commemorations in Whitianga. Richard Vetter, Former Director at Peninsula Scaffolding, highlighted how Layher products played a key role in the project’s success: “We used a combination of Layher Allround Scaffolding, Layher […] Continue reading