Instant Higher Education Access
Instant Access were contracted to provide this very high scaffolding solution. The scaffold enabled access for maintenance to the roof area of the NZEI Te Riu Roa building, Head Office for the New Zealand Education Institute in Wellington.
“At approximately 25m long and over 30m high, our client was struggling to find a way to safely access the cladding without building a full scaffold up from the ground”, said Joshua Mossman of Instant Access NZ.
Cleverly designed scaffold access
Instant Access designed and installed this scaffolding solution using Layher Allround Scaffolding and placed on the building’s external roof walkway. The cleverly designed scaffold cantilevered 0.73m from the outside edge of the building and then up the cladding – this provided excellent access for the contractors.
Thank you to Instant Access NZ for the use of these photos.
-
Contact
Instant Access NZ
Company
Location
Website
-
Components
Details
Layher Allround scaffold enabled access for maintenance to the roof area of the NZEI Te Riu Roa building
Comments
25m long and over 30m high, our client was struggling to find a way to safely access the cladding without building a full scaffold up from the ground
Instant Access NZ
MORE SCAFFOLDING PROJECTS
Approved Ponsonby Villa Repaint
Approved Scaffolding were requested to build a scaffold for a repaint on a Ponsonby Villa. The site was tight for Continue reading
Aston Towers Apartments
Aston Towers stands on the corner of Abel Smith Street overlooking Wellington’s CBD. This 1960’s built apartment block required re-painting Continue reading